Hospital

SAMSUN INTEGRATED HEALTH CAMPUS

The 900-bed Samsun Integrated Health Campus comprises two buildings: the Main Hospital and the Technical Service Building (TSB). The campus is located on a 220,000 m² site. Designed to meet earthquake-resistance requirements, the Main Hospital is organized around a central diagnostic block and two patient ward towers, each extending into four wings. It accommodates four specialized hospitals: the General Hospital, Women’s and Children’s Hospital, Cardiovascular Surgery Hospital, and Oncology Hospital.

The Main Hospital is designed in response to the site’s topography, with entrances positioned at different levels. The main entrance level provides access to the General Hospital and Women’s and Children’s Hospital polyclinics, as well as a central circulation spine organized around a gallery. The Cardiovascular Surgery and Oncology polyclinic entrances are located at the upper level, while the Emergency Department is accessed from a separate elevation to isolate emergency circulation from the main hospital traffic.

Access and circulation are carefully organized to separate patients, visitors, and staff. Outpatient, inpatient, visitor, staff, and service flows are differentiated through horizontal and vertical circulation systems and programmatic zoning, minimizing circulation conflicts and supporting efficient movement throughout the hospital.

The Main Hospital has a total enclosed construction area of 290,000 m².

EMPLOYER
T.C. Ministry Of Health
LOCATION AREA
Samsun / Turkey
PROJECT YEAR
2020
PROJECT AREA
310,000 sqm
Copyright © 2023 Selda Gumusdograyan Architecture. All Rights Reserved.
Ertürk Tasarım